Letter to Parliament about the package of measures for construction period of third track on Betuweroute

Letter by the State Secretary for Infrastructure and the Environment: Due to construction of the third track on the Betuweroute, from Zevenaar/Emmerich to Oberhausen, the Netherlands is facing reduced capacity on the Betuweroute from 2015 to 2022.

A package of measures has been developed, which consists of different categories:

  1. Rerouting;
  2. Preconditional measures;
  3. Measures to improve the capacity utilization;
  4. Other measures.